On July 28th, Hander Plumbing craned in the new boilers and equipment necessary to finalize the renovation of our new heating system. We have converted from a steam heat system to a hot water heat system. Pictured to the left is the 175 ton crane extending from the front of the building and lowering one of 2 pressure tanks into the boiler room.
The picture on the right shows one of the 4 new boilers that were craned over the school and lowered into the boiler room through a hole cut in the roof. Our new boiler system will be more efficient and dependable than the previous outdated system.
No comments:
Post a Comment
Please provide your comments and suggestions.