Where CHARACTER COUNTS!

Friday, August 5, 2011

Renovating Our Heating System

On July 28th, Hander Plumbing craned in the new boilers and equipment necessary to finalize the renovation of our new heating system. We have converted from a steam heat system to a hot water heat system. Pictured to the left is the 175 ton crane extending from the front of the building and lowering one of 2 pressure tanks into the boiler room.










The picture on the right shows one of the 4 new boilers that were craned over the school and lowered into the boiler room through a hole cut in the roof. Our new boiler system will be more efficient and dependable than the previous outdated system.

No comments:

Post a Comment

Please provide your comments and suggestions.